Particularities
-
- Quality Improvement
- Our Kumkang Aluminum Formwork produces an unbeatable concrete finishing which does not require any plastering and eliminate grinding task due to joints created by panels.
-
- Cost Reducer
- As our aluminum formwork allows an average of 6 days cycle, it considerably reduces the construction period. Reducing construction period will directly reduce the costruction cost.
-
- Time Saver
- The Kumkang Aluminum Formwork system allows a single pour of wall, beam, column, slab and staircases. Furthermore, our prop-head system will allow to dismantle the slab panels without removing the props. Thus, 6 days cycle is no longer a dream but a reality.
-
- Safety Provider
- Compared with the conventional method, our formwork system will allow a large working area for jobsite workers (fewer props). Furthermore, through the supply of external working platform, jobsite workers will feel much safer and increase their efficiency.
-
- Eco Friendly
- One of the best advantages of the aluminum formwork is repetition. While the conventional formwork must be thrown away after 5~10 repetitions and steel formwork after a maximum repetition of 50, the aluminum panels can last for over 300 repetitions.
-
- Total System
- With our Kumkang Aluminum Formwork, shoring and external working platforms are also supplied.